Barelli MSFS Addons Salerno (LIRI) for MSFS-2020
In July 2024 the main innovations will be:
- Runway extended to 2000 m
- Two new taxiways
- The main apron very enlarged compared to the current
- Start of works for the construction of the new General Aviation terminal, scheduled for 2025
- Runway extended to 2200 m
- New main terminal
- New GA terminal
- ILS navigation system (assumed)
- New airport buildings
- New car parkings
When publishing the 2024 version, it is important to specify that:
- Official Enav cards are not yet available, so the markings and signage are similar to the current ones, with the appropriate variants; as soon as official news will be ready, which may however delay, you will be provided with a free update.
Regarding the 2026 version, it is specified that: - Regarding the new terminal only architectural renderings are available, as officially presented in 2023, and based on these was created the new terminal for the simulator.
- Regarding the GA terminal there is no info, so the building was "invented", in the place where it will be built, inspired by existing GA terminals (Rome Ciampino and Olbia); also in this case, when and if news will be available, we will update.
- It is assumed, reading between the lines of the official statements, that there will be the subsidy of an ILS on runway 05, the frequency of which was imagined as 108.50 MHz.
- The new parkings of the cars have always been deducted from the official renderings.
Original: $11.38
-70%$11.38
$3.41Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
In July 2024 the main innovations will be:
- Runway extended to 2000 m
- Two new taxiways
- The main apron very enlarged compared to the current
- Start of works for the construction of the new General Aviation terminal, scheduled for 2025
- Runway extended to 2200 m
- New main terminal
- New GA terminal
- ILS navigation system (assumed)
- New airport buildings
- New car parkings
When publishing the 2024 version, it is important to specify that:
- Official Enav cards are not yet available, so the markings and signage are similar to the current ones, with the appropriate variants; as soon as official news will be ready, which may however delay, you will be provided with a free update.
Regarding the 2026 version, it is specified that: - Regarding the new terminal only architectural renderings are available, as officially presented in 2023, and based on these was created the new terminal for the simulator.
- Regarding the GA terminal there is no info, so the building was "invented", in the place where it will be built, inspired by existing GA terminals (Rome Ciampino and Olbia); also in this case, when and if news will be available, we will update.
- It is assumed, reading between the lines of the official statements, that there will be the subsidy of an ILS on runway 05, the frequency of which was imagined as 108.50 MHz.
- The new parkings of the cars have always been deducted from the official renderings.