















Barelli MSFS Addons Budapest (LHBP) for MSFS
Budapest â Ferenc Liszt International Airport (LHBP / BUD)
Hungaryâs main airport, about 16 km SE of downtown Budapest, named after Ferenc (Franz) Liszt since 2011. Opened on 7 May 1950, it is still colloquially known as âFerihegyâ.
ICAO LHBP, IATA BUD; elevation 151 m / 495 ft.
Two parallel runways: 13L/31R (3,707 m) and 13R/31L (3,010 m), asphalt/concrete surface.
Passengers use Terminal 2: 2A for Schengen flights, 2B for non-Schengen. SkyCourt connects 2A and 2B.
Terminal 1 has been closed since 2012 (following the collapse of Malév).
In 2024 it handled around 17.6 million passengers (an increase compared to 2023).
Formerly âBudapest Ferihegyâ, renamed in 2011 in honour of Liszt.
2012: closure of T1 and relocation of low-cost flights to T2.
2024: the Hungarian state acquires 80% of Budapest Airport; VINCI Airports takes a 20% stake and becomes the operator. A Terminal 3 is planned, with enhanced connections, target date 2032.
The BMA scenery for MSFS2020/2024 is updated to AIP Hungary AD-2-LHBP-PDC, JulyâSeptember 2025.
Original: $14.40
-70%$14.40
$4.32Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Budapest â Ferenc Liszt International Airport (LHBP / BUD)
Hungaryâs main airport, about 16 km SE of downtown Budapest, named after Ferenc (Franz) Liszt since 2011. Opened on 7 May 1950, it is still colloquially known as âFerihegyâ.
ICAO LHBP, IATA BUD; elevation 151 m / 495 ft.
Two parallel runways: 13L/31R (3,707 m) and 13R/31L (3,010 m), asphalt/concrete surface.
Passengers use Terminal 2: 2A for Schengen flights, 2B for non-Schengen. SkyCourt connects 2A and 2B.
Terminal 1 has been closed since 2012 (following the collapse of Malév).
In 2024 it handled around 17.6 million passengers (an increase compared to 2023).
Formerly âBudapest Ferihegyâ, renamed in 2011 in honour of Liszt.
2012: closure of T1 and relocation of low-cost flights to T2.
2024: the Hungarian state acquires 80% of Budapest Airport; VINCI Airports takes a 20% stake and becomes the operator. A Terminal 3 is planned, with enhanced connections, target date 2032.
The BMA scenery for MSFS2020/2024 is updated to AIP Hungary AD-2-LHBP-PDC, JulyâSeptember 2025.























